CONTENTS
TECHNICAL ENQUIRY
WIND POWER PLANTS OF SUB-MEGAWATT AND MEGAWATT CLASS IN THE CIS COUNTRIES
KAZAKHSTAN
Development of windpower energetics in Kazakhstan
Information on wind power plants being planned, designed and constructed in Kazakhstan
UKRAINE
Development of windpower energetics in Ukraine
Information on wind power plants being planned, designed and constructed in Ukraine
UZBEKISTAN
Development of windpower energetics in Uzbekistan
Information on wind power plants being planned, designed and constructed in Uzbekistan
AZERBAIJAN
Development of windpower energetics in Azerbaijan
Information on wind power plants being planned, designed and constructed in Azerbaijan
OTHER CIS COUNTRIES
Development of windpower energetics in other CIS countries
Information on wind power plants being planned, designed and constructed in other CIS countries
GENERAL OVERVIEW OF THE RUSSIAN MARKET OF WIND POWER PLANTS OF SMALL AND MEDIUM CAPACITY (UP TO 1 MW)
WIND POWER PLANTS FOR THE NEEDS OF RUSSIAN OIL AND GAS COMPANIES (OIL AND GAS PLATFORMS, ETC.) (UP TO 1MW)
PAO “NK Rosneft”
PAO “Gazprom” and PAO “Gazprom neft”
PAO “Tatneft”
PAO “Novatek”
PAO “Lukoil”
PAO “Sibur Holding”
PAO “Transneft”
recommendations for the promotion of wind power plants to the russian market for the needs of oil and gas companies
SEGMENT "SUPPORTS, PILES, TANKS, METAL CASES FOR GAS INDUSTRY"
declared purchases related to the installation / use of metal supports, piles, cases by the gas industry
SEGMENT "PILES AND METAL SUPPORTS FOR BRIDGES AND DOCKS"
technical requirements (parameters) presented for the purchased metal supports, piles in the construction of bridges
technical requirements (parameters) presented for the purchased metal supports, piles in the construction of docks
SEGMENT "SUPPORTS, PILES, TANKS, PONTOONS FOR OFFSHORE GAS / OIL PLATFORMS AND DRILLING STATIONS"
declared purchases related to the installation / use of metal supports, piles, tanks, pontoons in the construction of offshore gas / oil platforms and drilling stations
OTHER SEGMENTS
nuclear industry
boiler building
metallurgy
cement industry
tanks and reservoirs
shipbuilding and ship repair
heavy engineering
other engineering
COMPETITION LEVEL IN THE MARKET OF UOE SERVICES
SUMMARY ON THE STUDIED SEGMENTS
APPENDICES
Appendix 1. Tender procedure for RES in the CIS countries
LIST OF TABLES AND DIAGRAMS
TABLE 1. STATE PROGRAMS FOR STIMULATION AND DEVELOPMENT OF RES (INCLUDING WIND POWER PLANTS) IN KAZAKHSTAN
TABLE 2. SCHEDULE OF TENDERS, APPROVED BY ORDER OF THE MINISTRY OF ENERGY OF KAZAKHSTAN
TABLE 3. RESULTS OF RES TENDERS IN 2020
TABLE 4. RES SECTOR DEVELOPMENT TARGETS UNTIL 2020
TABLE 5. DEVELOPMENT TARGETS FOR THE RES SECTOR UNTIL 2050 IN ACCORDANCE WITH THE "DEVELOPMENT STRATEGY OF KAZAKHSTAN-2025" (AS REVISED ON 26.02.2021)
TABLE 6. DYNAMICS AND STRUCTURE OF THE RES MARKET IN KAZAKHSTAN (INCLUDING WIND POWER PLANTS) BY TYPE, 2014-2020
TABLE 7. DYNAMICS AND STRUCTURE OF ELECTRIC POWER GENERATION IN KAZAKHSTAN BY TYPE, 2018-2020, mln. KW * h
TABLE 8. DYNAMICS AND STRUCTURE OF THE INSTALLED CAPACITY OF POWER PLANTS IN KAZAKHSTAN (AT THE END OF THE YEAR) BY TYPE, 2018-2020, MW
TABLE 9. COMPARISON OF TARGETS AND ACTUAL INDICATORS OF RES DEVELOPMENT IN KAZAKHSTAN UNTIL 2020
TABLE 10. NUMBER AND CAPACITY OF IDENTIFIED WIND POWER PLANTS CONSTRUCTION PROJECTS IN KAZAKHSTAN BY REGIONS
TABLE 11. LIST AND PARAMETERS OF WIND POWER PLANTS CONSTRUCTION PROJECTS IN KAZAKHSTAN, CONFIRMED PROJECTS
TABLE 12. LIST AND PARAMETERS OF PROJECTS FOR CONSTRUCTION OF WIND POWER PLANTS IN KAZAKHSTAN, PROJECTS FOR WHICH THERE WAS NO CONFIRMED STATUS AVAILABLE
TABLE 13. COMPANIES AND CONTACT PERSONS FOR WIND POWER PLANTS CONSTRUCTION IN KAZAKHSTAN, IMPLEMENTED AND CURRENT PROJECTS, INTEREST IN COOPERATION
TABLE 14. DESIGN ORGANIZATIONS PARTICIPATING IN WIND POWER PLANTS CONSTRUCTION PROJECTS IN KAZAKHSTAN
TABLE 15. SUPPLIERS OF EQUIPMENT FOR WIND POWER PLANTS PROJECTS IN KAZAKHSTAN, WITH WHICH SUPPLY COOPERATION IS POSSIBLE
TABLE 16. OTHER ORGANIZATIONS FOR INTERACTION IN THE WIND POWER PLANTS MARKET OF KAZAKHSTAN
TABLE 17. STATE PROGRAMS FOR STIMULATION AND DEVELOPMENT OF RES (INCLUDING WIND POWER) IN UKRAINE
TABLE 18. GREEN TARIFF RATIO FOR WIND POWER PLANTS CONSISTING OF WIND POWER UNITS WITH A SINGLE INSTALLED POWER OF MORE THAN 2000 KW
TABLE 19. ADDITIVES TO GREEN RATES FOR USE OF EQUIPMENT OF UKRAINIAN PRODUCTION
TABLE 20. EQUIPMENT USE LEVEL DEPENDING ON THE TYPE OF EQUIPMENT (COMPONENT) WHEN CALCULATING ADDITIVES TO GREEN RATES
TABLE 21. DEVELOPMENT TARGETS FOR THE RES SECTOR IN UKRAINE UNTIL 2035
TABLE 22. FORECAST EVALUATION OF UWEA ON THE INSTALLED CAPACITY OF RES FACILITIES IN UKRAINE UNTIL 2035
TABLE 23. DYNAMICS AND STRUCTURE OF THE INSTALLED CAPACITY OF POWER PLANTS IN UKRAINE (AT THE END OF THE YEAR) IN A SECTION BY TYPES OF POWER PLANTS, 2015-2020
TABLE 24. DYNAMICS AND STRUCTURE OF ELECTRIC POWER GENERATION IN UKRAINE BY TYPES OF POWER PLANTS, 2015-2020
TABLE 25. SHARE OF WIND POWER PLANTS IN THE STRUCTURE OF INSTALLED CAPACITY OF POWER PLANTS, AS WELL AS IN POWER GENERATION IN UKRAINE, 2020
TABLE 26. NUMBER AND CAPACITY OF IDENTIFIED WIND POWER PLANTS CONSTRUCTION PROJECTS IN UKRAINE BY AREAS
TABLE 27. LIST AND PARAMETERS OF WIND POWER PLANTS CONSTRUCTION PROJECTS IN UKRAINE
TABLE 28. COMPANIES AND CONTACT PERSONS FOR WIND POWER PLANTS CONSTRUCTION IN UKRAINE, INTEREST IN COOPERATION
TABLE 14. DESIGN ORGANIZATIONS PARTICIPATING IN WIND POWER PLANTS CONSTRUCTION PROJECTS IN UKRAINE
TABLE 29. STATE PROGRAMS FOR STIMULATION AND DEVELOPMENT OF RES (INCLUDING WIND POWER) IN UZBEKISTAN
TABLE 30. TARGET PARAMETERS OF RES DEVELOPMENT ACCORDING TO THE DECREE OF THE PRESIDENT OF THE REPUBLIC OF UZBEKISTAN DATED 22.08.2019 No. PP-4422
TABLE 31. DYNAMICS AND STRUCTURE OF INSTALLED POWER AND POWER GENERATION IN UZBEKISTAN (AT THE END OF THE YEAR) IN A SECTION BY TYPES OF POWER PLANTS, 2015-2020
TABLE 32. LIST AND PARAMETERS OF CONFIRMED PROJECTS FOR CONSTRUCTION OF WIND POWER PLANTS IN UZBEKISTAN
TABLE 33. CONTACT PERSONS FOR COOPERATION ON WIND POWER PLANTS PROJECTS IN UZBEKISTAN
TABLE 34. STATE PROGRAMS FOR STIMULATION AND DEVELOPMENT OF RES (INCLUDING WIND POWER) IN AZERBAIJAN
TABLE 35. DYNAMICS AND STRUCTURE OF INSTALLED CAPACITY AND POWER GENERATION IN AZERBAIJAN (AT THE END OF THE YEAR) IN A SECTION BY TYPES OF POWER PLANTS, 2015-2020
TABLE 36. LIST AND PARAMETERS OF CONFIRMED PROJECTS FOR CONSTRUCTION OF WIND POWER PLANTS IN AZERBAIJAN
TABLE 37. CONTACT PERSONS FOR COOPERATION ON WIND POWER PLANTS PROJECTS IN AZERBAIJAN
TABLE 38. MEASURES OF SUPPORT FOR RES AND FEATURES OF THE RES MARKET (INCLUDING WIND POWER) IN OTHER CIS COUNTRIES
TABLE 39. RES DEVELOPMENT TARGETS IN OTHER CIS COUNTRIES
TABLE 40. LIST OF STATE STIMULATION PROGRAMS FOR RES (INCLUDING WIND POWER) IN OTHER CIS COUNTRIES
TABLE 41. QUOTAS FOR CREATION OF UNITS FOR USING RES IN BELARUS FOR 2021-2023, MW
TABLE 42. PLANNED RES CAPACITIES IN ACCORDANCE WITH THE SUPPORT OF THE GOVERNMENT OF MOLDOVA IN THE FRAMEWORK OF FIXED RATES AND FIXED PRICES (TIME IS NOT DEFINED)
TABLE 43. DYNAMICS AND STRUCTURE OF THE INSTALLED CAPACITY OF POWER PLANTS IN OTHER CIS COUNTRIES (AT THE END OF THE YEAR) IN A SECTION BY TYPES OF POWER PLANTS, 2015-2020
TABLE 44. DYNAMICS AND STRUCTURE OF POWER GENERATION IN OTHER CIS COUNTRIES (AT THE END OF THE YEAR) IN A SECTION BY POWER PLANT TYPES, 2015-2020
TABLE 45. LIST AND PARAMETERS OF WIND POWER PLANTS CONSTRUCTION PROJECTS IN BELARUS
TABLE 45. LIST AND PARAMETERS OF WIND POWER PLANTS CONSTRUCTION PROJECTS IN OTHER CIS COUNTRIES
TABLE 13. COMPANIES AND CONTACT PERSONS FOR COOPERATION ON WIND POWER PLANTS PROJECTS IN BELARUS
TABLE 46. CONTACT PERSONS FOR COOPERATION ON WIND POWER PLANTS PROJECTS IN OTHER CIS COUNTRIES
TABLE 47. PROJECTS FOR CONSTRUCTION AND MODERNIZATION OF "ROSNEFT"RES OBJECTS
TABLE 48. PROJECTS OF THE COMPANY "ROSNEFT": PROJECT OF AO "SIBNEFTEGAZ"
TABLE 49. PROJECTS OF THE COMPANY "ROSNEFT": PROJECT OF OOO "RN-KRASNODARNEFTEGAZ"
TABLE 50. PROJECTS OF THE ROSNEFT COMPANY: PROJECT OF THE HYBRID POWER PLANT OF THE RUSSIAN ARCTIC NATIONAL PARK
TABLE 51. ROSNEFT PROJECTS: OOO “RN-VANKOR” PROJECT IN KRASNOYARSK KRAI
TABLE 52. PROJECTS FOR CONSTRUCTION AND MODERNIZATION OF "GAZPROM" AND "GAZPROM NEFT" RES OBJECTS
TABLE 53."GAZPROM" PROJECTS: COMBINED WIND-SOLAR POWER PLANT IN THE LENINGRAD REGION
TABLE 54."GAZPROM" PROJECTS: PROJECT OF OOO "GAZPROM TRANSGAZ ST. PETERSBURG"
TABLE 55."GAZPROM" PROJECTS: HYBRID POWER PLANT "YURTA"
TABLE 56. "TATNEFT" PROJECT
TABLE 57. NOVATEK PROJECT IN YNAO
TABLE 58. PROJECTS FOR CONSTRUCTION AND MODERNIZATION OF RES OBJECTS OF THE COMPANY "LUKOIL"
TABLE 59. LUKOIL COMPANY'S PROJECT FOR CONSTRUCTION OF WIND POWER PLANTS IN THE ROSTOV REGION
TABLE 60. RESULTS OF STUDYING THE WIND POWER SEGMENT FOR THE NEEDS OF RUSSIAN OIL AND GAS COMPANIES
TABLE 61. PARAMETERS AND CHARACTERISTICS OF PRODUCTS AMONG THE IDENTIFIED PURCHASES OF THE SEGMENT’S COMPANIES
TABLE 62. DECLARED PURCHASES RELATED TO THE INSTALLATION / USE OF METAL SUPPORTS, PILES, CASES BY THE OIL AND GAS INDUSTRY
TABLE 63. LARGEST BRIDGE CONSTRUCTION PROJECTS IN 2000-2020
TABLE 64. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED METAL SUPPORTS, PILES IN THE CONSTRUCTION OF BRIDGES
TABLE 65. KEY PROJECTS FOR CONSTRUCTION OF DOCK FACILITIES IN RUSSIA SINCE 2018
TABLE 66. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED METAL SUPPORTS, PILES IN THE CONSTRUCTION OF DOCKS
TABLE 67. PROSPECTIVE PROJECTS FOR CONSTRUCTION OF THE OFFSHORE ICE-RESISTANT PLATFORMS (OIRP) WITH HIGH POTENTIAL OF APPLICATION OF PIPE PILES FROM SHELL COURSES
TABLE 68. IDENTIFIED DESIGN ORGANIZATIONS INVOLVED IN THE DEVELOPMENT OF DOCUMENTATION FOR THE CONSTRUCTION OF EXISTING OIRP
TABLE 69. COMPETITORS IN THE SEGMENT OF PRODUCTION OF PIPE PILES FROM SHELL COURSES
TABLE 70. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE SEGMENT “SUPPORTS, PILES, TANKS, PONTOONS FOR MARINE GAS AND OIL PLATFORMS AND DRILLING STATIONS”
TABLE 71. MAIN TYPES AND PARAMETERS OF PURCHASED HOLLOW PRODUCTS IN THE "NUCLEAR INDUSTRY" SEGMENT
TABLE 72. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE "NUCLEAR INDUSTRY" SEGMENT IN A SECTION BY ENTERPRISE
TABLE 73. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE "BOILER BUILDING" SEGMENT IN A SECTION BY ENTERPRISE
TABLE 74. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE METALLURGY SEGMENT IN A SECTION BY ENTERPRISES
TABLE 75. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE SEGMENT "CEMENT INDUSTRY" IN A SECTION BY ENTERPRISE
TABLE 76. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE SEGMENT "TANKS" IN A SECTION BY ENTERPRISE
TABLE 77. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE SEGMENT "SHIPBUILDING AND SHIP REPAIR" IN A SECTION BY ENTERPRISE
TABLE 78. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE "HEAVY MACHINERY" SEGMENT IN A SECTION BY ENTERPRISES
TABLE 79. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE "OTHER ENGINEERING" SEGMENT IN A SECTION BY ENTERPRISE
TABLE 80. COMPANIES PROVIDING SERVICES ON ROLLING / MANUFACTURING OF SHELL COURSES WITH LESS THEN 50 MM THICKNESS
TABLE 81. COMPANIES PROVIDING SERVICES ON ROLLING / MANUFACTURING OF SHELL COURSES WITH THE THICKNESS OVER 50 MM
TABLE 82. STUDY RESULTS OF THE SEGMENT "WIND POWER PLANTS OF THE CIS COUNTRIES"
TABLE 83. POINTS OF ENTRY TO THE WIND POWER PLANTS MARKET OF THE CIS COUNTRIES
TABLE 84. RESULTS OF STUDYING THE SEGMENT OF WIND POWER STATIONS FOR THE NEEDS OF RUSSIAN OIL AND GAS COMPANIES
TABLE 85. RESULTS OF THE STUDY OF PROMOTION PERSPECTIVES IN SEPARATE SEGMENTS
TABLE 86. PROSPECTIVE PROJECTS FOR THE CONSTRUCTION OF OFFSHORE ICE RESISTANT STATIONARY PLATFORMS WITH A HIGH POTENTIAL OF APPLICATION OF PIPE PILES FROM SHELL COURSES
TABLE 87. RESULTS OF STUDYING DEMAND IN THE "ROLLING SERVICES IN RF" SEGMENT
TABLE 88. PROSPECTIVE COMPANIES FOR COOPERATION IN THE "ROLLING SERVICES IN RF" SEGMENT
TABLE 89. SUMMARY DATA ON TENDERS (AUCTIONS) FOR RES OBJECTS IN A SECTION OF THE CIS COUNTRIES
FIGURE 1. ZONES OF DECENTRALIZED POWER SUPPLY IN THE RUSSIAN FEDERATION
FIGURE 2. POTENTIAL CONSUMERS WITHIN DECENTRALIZED POWER SUPPLY
FIGURE 3. LARGE DIAMETER SHELL INSTALLATION PROCESS
FIGURE 4. «MOLIKPAK» PLATFORM AND ITS FOUNDATION
FIGURE 5. «PRIRAZLOMNAYA» PLATFORM
FIGURE 6. «BERKUT» PLATFORM FOUNDATION
FIGURE 7. SUPPORT BLOCK OF THE CENTRAL TECHNOLOGICAL PLATFORM OF THE DEPOSIT NAMED AFTER V. FILANOVSKY
FIGURE 8. FIRST PHASE OF DEPOSIT NAMED AFTER V. FILANOVSKY (LEFT TO RIGHT: ПЖМ-1, ЛСП-1, ЦТП AND РБ)
FIGURE 9. PAO LUKOIL'S SHELF DEPOSITS PLANNED FOR DEVELOPMENT IN THE CASPIAN SEA
FIGURE 10. SHELF DEPOSITS PLANNED FOR DEVELOPMENT BY PAO "GAZPROM" (OOO "GAZPROM DOBYCHA YAMBURG")
FIGURE 11. SEFDR «ARKTICHESKAYA»
FIGURE 12. MFDR «POLYARNAYA ZVEZDA»