Request a call

Market research for hollow metal structures

Print

Дата разработки: 27.05.2021

Информация о проекте представлена для демонстрации наших возможностей. Вы можете заказать аналогичное исследование с учетом Ваших задач.

Заказать аналогичное исследование | Демо-версия

Market research for hollow metal structures


CONTENTS

TECHNICAL ENQUIRY

WIND POWER PLANTS OF SUB-MEGAWATT AND MEGAWATT CLASS IN THE CIS COUNTRIES

KAZAKHSTAN

Development of windpower energetics in Kazakhstan

Information on wind power plants being planned, designed and constructed in Kazakhstan

UKRAINE

Development of windpower energetics in Ukraine

Information on wind power plants being planned, designed and constructed in Ukraine

UZBEKISTAN

Development of windpower energetics in Uzbekistan

Information on wind power plants being planned, designed and constructed in Uzbekistan

AZERBAIJAN

Development of windpower energetics in Azerbaijan

Information on wind power plants being planned, designed and constructed in Azerbaijan

OTHER CIS COUNTRIES

Development of windpower energetics in other CIS countries

Information on wind power plants being planned, designed and constructed in other CIS countries

GENERAL OVERVIEW OF THE RUSSIAN MARKET OF WIND POWER PLANTS OF SMALL AND MEDIUM CAPACITY (UP TO 1 MW)

WIND POWER PLANTS FOR THE NEEDS OF RUSSIAN OIL AND GAS COMPANIES (OIL AND GAS PLATFORMS, ETC.) (UP TO 1MW)

PAO “NK Rosneft”

PAO “Gazprom” and PAO “Gazprom neft”

PAO “Tatneft”

PAO “Novatek”

PAO “Lukoil”

PAO “Sibur Holding”

PAO “Transneft”

recommendations for the promotion of wind power plants to the russian market for the needs of oil and gas companies

SEGMENT "SUPPORTS, PILES, TANKS, METAL CASES FOR GAS INDUSTRY"

declared purchases related to the installation / use of metal supports, piles, cases by the gas industry

SEGMENT "PILES AND METAL SUPPORTS FOR BRIDGES AND DOCKS"

technical requirements (parameters) presented for the purchased metal supports, piles in the construction of bridges

technical requirements (parameters) presented for the purchased metal supports, piles in the construction of docks

SEGMENT "SUPPORTS, PILES, TANKS, PONTOONS FOR OFFSHORE GAS / OIL PLATFORMS AND DRILLING STATIONS"

declared purchases related to the installation / use of metal supports, piles, tanks, pontoons in the construction of offshore gas / oil platforms and drilling stations

OTHER SEGMENTS

nuclear industry

boiler building

metallurgy

cement industry

tanks and reservoirs

shipbuilding and ship repair

heavy engineering

other engineering

COMPETITION LEVEL IN THE MARKET OF UOE SERVICES

SUMMARY ON THE STUDIED SEGMENTS

APPENDICES

Appendix 1. Tender procedure for RES in the CIS countries

LIST OF TABLES AND DIAGRAMS

TABLE 1. STATE PROGRAMS FOR STIMULATION AND DEVELOPMENT OF RES (INCLUDING WIND POWER PLANTS) IN KAZAKHSTAN

TABLE 2. SCHEDULE OF TENDERS, APPROVED BY ORDER OF THE MINISTRY OF ENERGY OF KAZAKHSTAN

TABLE 3. RESULTS OF RES TENDERS IN 2020

TABLE 4. RES SECTOR DEVELOPMENT TARGETS UNTIL 2020

TABLE 5. DEVELOPMENT TARGETS FOR THE RES SECTOR UNTIL 2050 IN ACCORDANCE WITH THE "DEVELOPMENT STRATEGY OF KAZAKHSTAN-2025" (AS REVISED ON 26.02.2021)

TABLE 6. DYNAMICS AND STRUCTURE OF THE RES MARKET IN KAZAKHSTAN (INCLUDING WIND POWER PLANTS) BY TYPE, 2014-2020

TABLE 7. DYNAMICS AND STRUCTURE OF ELECTRIC POWER GENERATION IN KAZAKHSTAN BY TYPE, 2018-2020, mln. KW * h

TABLE 8. DYNAMICS AND STRUCTURE OF THE INSTALLED CAPACITY OF POWER PLANTS IN KAZAKHSTAN (AT THE END OF THE YEAR) BY TYPE, 2018-2020, MW

TABLE 9. COMPARISON OF TARGETS AND ACTUAL INDICATORS OF RES DEVELOPMENT IN KAZAKHSTAN UNTIL 2020

TABLE 10. NUMBER AND CAPACITY OF IDENTIFIED WIND POWER PLANTS CONSTRUCTION PROJECTS IN KAZAKHSTAN BY REGIONS

TABLE 11. LIST AND PARAMETERS OF WIND POWER PLANTS CONSTRUCTION PROJECTS IN KAZAKHSTAN, CONFIRMED PROJECTS

TABLE 12. LIST AND PARAMETERS OF PROJECTS FOR CONSTRUCTION OF WIND POWER PLANTS IN KAZAKHSTAN, PROJECTS FOR WHICH THERE WAS NO CONFIRMED STATUS AVAILABLE

TABLE 13. COMPANIES AND CONTACT PERSONS FOR WIND POWER PLANTS CONSTRUCTION IN KAZAKHSTAN, IMPLEMENTED AND CURRENT PROJECTS, INTEREST IN COOPERATION

TABLE 14. DESIGN ORGANIZATIONS PARTICIPATING IN WIND POWER PLANTS CONSTRUCTION PROJECTS IN KAZAKHSTAN

TABLE 15. SUPPLIERS OF EQUIPMENT FOR WIND POWER PLANTS PROJECTS IN KAZAKHSTAN, WITH WHICH SUPPLY COOPERATION IS POSSIBLE

TABLE 16. OTHER ORGANIZATIONS FOR INTERACTION IN THE WIND POWER PLANTS MARKET OF KAZAKHSTAN

TABLE 17. STATE PROGRAMS FOR STIMULATION AND DEVELOPMENT OF RES (INCLUDING WIND POWER) IN UKRAINE

TABLE 18. GREEN TARIFF RATIO FOR WIND POWER PLANTS CONSISTING OF WIND POWER UNITS WITH A SINGLE INSTALLED POWER OF MORE THAN 2000 KW

TABLE 19. ADDITIVES TO GREEN RATES FOR USE OF EQUIPMENT OF UKRAINIAN PRODUCTION

TABLE 20. EQUIPMENT USE LEVEL DEPENDING ON THE TYPE OF EQUIPMENT (COMPONENT) WHEN CALCULATING ADDITIVES TO GREEN RATES

TABLE 21. DEVELOPMENT TARGETS FOR THE RES SECTOR IN UKRAINE UNTIL 2035

TABLE 22. FORECAST EVALUATION OF UWEA ON THE INSTALLED CAPACITY OF RES FACILITIES IN UKRAINE UNTIL 2035

TABLE 23. DYNAMICS AND STRUCTURE OF THE INSTALLED CAPACITY OF POWER PLANTS IN UKRAINE (AT THE END OF THE YEAR) IN A SECTION BY TYPES OF POWER PLANTS, 2015-2020

TABLE 24. DYNAMICS AND STRUCTURE OF ELECTRIC POWER GENERATION IN UKRAINE BY TYPES OF POWER PLANTS, 2015-2020

TABLE 25. SHARE OF WIND POWER PLANTS IN THE STRUCTURE OF INSTALLED CAPACITY OF POWER PLANTS, AS WELL AS IN POWER GENERATION IN UKRAINE, 2020

TABLE 26. NUMBER AND CAPACITY OF IDENTIFIED WIND POWER PLANTS CONSTRUCTION PROJECTS IN UKRAINE BY AREAS

TABLE 27. LIST AND PARAMETERS OF WIND POWER PLANTS CONSTRUCTION PROJECTS IN UKRAINE

TABLE 28. COMPANIES AND CONTACT PERSONS FOR WIND POWER PLANTS CONSTRUCTION IN UKRAINE, INTEREST IN COOPERATION

TABLE 14. DESIGN ORGANIZATIONS PARTICIPATING IN WIND POWER PLANTS CONSTRUCTION PROJECTS IN UKRAINE

TABLE 29. STATE PROGRAMS FOR STIMULATION AND DEVELOPMENT OF RES (INCLUDING WIND POWER) IN UZBEKISTAN

TABLE 30. TARGET PARAMETERS OF RES DEVELOPMENT ACCORDING TO THE DECREE OF THE PRESIDENT OF THE REPUBLIC OF UZBEKISTAN DATED 22.08.2019 No. PP-4422

TABLE 31. DYNAMICS AND STRUCTURE OF INSTALLED POWER AND POWER GENERATION IN UZBEKISTAN (AT THE END OF THE YEAR) IN A SECTION BY TYPES OF POWER PLANTS, 2015-2020

TABLE 32. LIST AND PARAMETERS OF CONFIRMED PROJECTS FOR CONSTRUCTION OF WIND POWER PLANTS IN UZBEKISTAN

TABLE 33. CONTACT PERSONS FOR COOPERATION ON WIND POWER PLANTS PROJECTS IN UZBEKISTAN

TABLE 34. STATE PROGRAMS FOR STIMULATION AND DEVELOPMENT OF RES (INCLUDING WIND POWER) IN AZERBAIJAN

TABLE 35. DYNAMICS AND STRUCTURE OF INSTALLED CAPACITY AND POWER GENERATION IN AZERBAIJAN (AT THE END OF THE YEAR) IN A SECTION BY TYPES OF POWER PLANTS, 2015-2020

TABLE 36. LIST AND PARAMETERS OF CONFIRMED PROJECTS FOR CONSTRUCTION OF WIND POWER PLANTS IN AZERBAIJAN

TABLE 37. CONTACT PERSONS FOR COOPERATION ON WIND POWER PLANTS PROJECTS IN AZERBAIJAN

TABLE 38. MEASURES OF SUPPORT FOR RES AND FEATURES OF THE RES MARKET (INCLUDING WIND POWER) IN OTHER CIS COUNTRIES

TABLE 39. RES DEVELOPMENT TARGETS IN OTHER CIS COUNTRIES

TABLE 40. LIST OF STATE STIMULATION PROGRAMS FOR RES (INCLUDING WIND POWER) IN OTHER CIS COUNTRIES

TABLE 41. QUOTAS FOR CREATION OF UNITS FOR USING RES IN BELARUS FOR 2021-2023, MW

TABLE 42. PLANNED RES CAPACITIES IN ACCORDANCE WITH THE SUPPORT OF THE GOVERNMENT OF MOLDOVA IN THE FRAMEWORK OF FIXED RATES AND FIXED PRICES (TIME IS NOT DEFINED)

TABLE 43. DYNAMICS AND STRUCTURE OF THE INSTALLED CAPACITY OF POWER PLANTS IN OTHER CIS COUNTRIES (AT THE END OF THE YEAR) IN A SECTION BY TYPES OF POWER PLANTS, 2015-2020

TABLE 44. DYNAMICS AND STRUCTURE OF POWER GENERATION IN OTHER CIS COUNTRIES (AT THE END OF THE YEAR) IN A SECTION BY POWER PLANT TYPES, 2015-2020

TABLE 45. LIST AND PARAMETERS OF WIND POWER PLANTS CONSTRUCTION PROJECTS IN BELARUS

TABLE 45. LIST AND PARAMETERS OF WIND POWER PLANTS CONSTRUCTION PROJECTS IN OTHER CIS COUNTRIES

TABLE 13. COMPANIES AND CONTACT PERSONS FOR COOPERATION ON WIND POWER PLANTS PROJECTS IN BELARUS

TABLE 46. CONTACT PERSONS FOR COOPERATION ON WIND POWER PLANTS PROJECTS IN OTHER CIS COUNTRIES

TABLE 47. PROJECTS FOR CONSTRUCTION AND MODERNIZATION OF "ROSNEFT"RES OBJECTS

TABLE 48. PROJECTS OF THE COMPANY "ROSNEFT": PROJECT OF AO "SIBNEFTEGAZ"

TABLE 49. PROJECTS OF THE COMPANY "ROSNEFT": PROJECT OF OOO "RN-KRASNODARNEFTEGAZ"

TABLE 50. PROJECTS OF THE ROSNEFT COMPANY: PROJECT OF THE HYBRID POWER PLANT OF THE RUSSIAN ARCTIC NATIONAL PARK

TABLE 51. ROSNEFT PROJECTS: OOO “RN-VANKOR” PROJECT IN KRASNOYARSK KRAI

TABLE 52. PROJECTS FOR CONSTRUCTION AND MODERNIZATION OF "GAZPROM" AND "GAZPROM NEFT" RES OBJECTS

TABLE 53."GAZPROM" PROJECTS: COMBINED WIND-SOLAR POWER PLANT IN THE LENINGRAD REGION

TABLE 54."GAZPROM" PROJECTS: PROJECT OF OOO "GAZPROM TRANSGAZ ST. PETERSBURG"

TABLE 55."GAZPROM" PROJECTS: HYBRID POWER PLANT "YURTA"

TABLE 56. "TATNEFT" PROJECT

TABLE 57. NOVATEK PROJECT IN YNAO

TABLE 58. PROJECTS FOR CONSTRUCTION AND MODERNIZATION OF RES OBJECTS OF THE COMPANY "LUKOIL"

TABLE 59. LUKOIL COMPANY'S PROJECT FOR CONSTRUCTION OF WIND POWER PLANTS IN THE ROSTOV REGION

TABLE 60. RESULTS OF STUDYING THE WIND POWER SEGMENT FOR THE NEEDS OF RUSSIAN OIL AND GAS COMPANIES

TABLE 61. PARAMETERS AND CHARACTERISTICS OF PRODUCTS AMONG THE IDENTIFIED PURCHASES OF THE SEGMENT’S COMPANIES

TABLE 62. DECLARED PURCHASES RELATED TO THE INSTALLATION / USE OF METAL SUPPORTS, PILES, CASES BY THE OIL AND GAS INDUSTRY

TABLE 63. LARGEST BRIDGE CONSTRUCTION PROJECTS IN 2000-2020

TABLE 64. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED METAL SUPPORTS, PILES IN THE CONSTRUCTION OF BRIDGES

TABLE 65. KEY PROJECTS FOR CONSTRUCTION OF DOCK FACILITIES IN RUSSIA SINCE 2018

TABLE 66. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED METAL SUPPORTS, PILES IN THE CONSTRUCTION OF DOCKS

TABLE 67. PROSPECTIVE PROJECTS FOR CONSTRUCTION OF THE OFFSHORE ICE-RESISTANT PLATFORMS (OIRP) WITH HIGH POTENTIAL OF APPLICATION OF PIPE PILES FROM SHELL COURSES

TABLE 68. IDENTIFIED DESIGN ORGANIZATIONS INVOLVED IN THE DEVELOPMENT OF DOCUMENTATION FOR THE CONSTRUCTION OF EXISTING OIRP

TABLE 69. COMPETITORS IN THE SEGMENT OF PRODUCTION OF PIPE PILES FROM SHELL COURSES

TABLE 70. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE SEGMENT “SUPPORTS, PILES, TANKS, PONTOONS FOR MARINE GAS AND OIL PLATFORMS AND DRILLING STATIONS”

TABLE 71. MAIN TYPES AND PARAMETERS OF PURCHASED HOLLOW PRODUCTS IN THE "NUCLEAR INDUSTRY" SEGMENT

TABLE 72. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE "NUCLEAR INDUSTRY" SEGMENT IN A SECTION BY ENTERPRISE

TABLE 73. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE "BOILER BUILDING" SEGMENT IN A SECTION BY ENTERPRISE

TABLE 74. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE METALLURGY SEGMENT IN A SECTION BY ENTERPRISES

TABLE 75. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE SEGMENT "CEMENT INDUSTRY" IN A SECTION BY ENTERPRISE

TABLE 76. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE SEGMENT "TANKS" IN A SECTION BY ENTERPRISE

TABLE 77. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE SEGMENT "SHIPBUILDING AND SHIP REPAIR" IN A SECTION BY ENTERPRISE

TABLE 78. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE "HEAVY MACHINERY" SEGMENT IN A SECTION BY ENTERPRISES

TABLE 79. TECHNICAL REQUIREMENTS (PARAMETERS) PRESENTED FOR THE PURCHASED HOLLOW METAL STRUCTURES IN THE "OTHER ENGINEERING" SEGMENT IN A SECTION BY ENTERPRISE

TABLE 80. COMPANIES PROVIDING SERVICES ON ROLLING / MANUFACTURING OF SHELL COURSES WITH LESS THEN 50 MM THICKNESS

TABLE 81. COMPANIES PROVIDING SERVICES ON ROLLING / MANUFACTURING OF SHELL COURSES WITH THE THICKNESS OVER 50 MM

TABLE 82. STUDY RESULTS OF THE SEGMENT "WIND POWER PLANTS OF THE CIS COUNTRIES"

TABLE 83. POINTS OF ENTRY TO THE WIND POWER PLANTS MARKET OF THE CIS COUNTRIES

TABLE 84. RESULTS OF STUDYING THE SEGMENT OF WIND POWER STATIONS FOR THE NEEDS OF RUSSIAN OIL AND GAS COMPANIES

TABLE 85. RESULTS OF THE STUDY OF PROMOTION PERSPECTIVES IN SEPARATE SEGMENTS

TABLE 86. PROSPECTIVE PROJECTS FOR THE CONSTRUCTION OF OFFSHORE ICE RESISTANT STATIONARY PLATFORMS WITH A HIGH POTENTIAL OF APPLICATION OF PIPE PILES FROM SHELL COURSES

TABLE 87. RESULTS OF STUDYING DEMAND IN THE "ROLLING SERVICES IN RF" SEGMENT

TABLE 88. PROSPECTIVE COMPANIES FOR COOPERATION IN THE "ROLLING SERVICES IN RF" SEGMENT

TABLE 89. SUMMARY DATA ON TENDERS (AUCTIONS) FOR RES OBJECTS IN A SECTION OF THE CIS COUNTRIES

FIGURE 1. ZONES OF DECENTRALIZED POWER SUPPLY IN THE RUSSIAN FEDERATION

FIGURE 2. POTENTIAL CONSUMERS WITHIN DECENTRALIZED POWER SUPPLY

FIGURE 3. LARGE DIAMETER SHELL INSTALLATION PROCESS

FIGURE 4. «MOLIKPAK» PLATFORM AND ITS FOUNDATION

FIGURE 5. «PRIRAZLOMNAYA» PLATFORM

FIGURE 6. «BERKUT» PLATFORM FOUNDATION

FIGURE 7. SUPPORT BLOCK OF THE CENTRAL TECHNOLOGICAL PLATFORM OF THE DEPOSIT NAMED AFTER V. FILANOVSKY

FIGURE 8. FIRST PHASE OF DEPOSIT NAMED AFTER V. FILANOVSKY (LEFT TO RIGHT: ПЖМ-1, ЛСП-1, ЦТП AND РБ)

FIGURE 9.  PAO LUKOIL'S SHELF DEPOSITS PLANNED FOR DEVELOPMENT IN THE CASPIAN SEA

FIGURE 10.  SHELF DEPOSITS PLANNED FOR DEVELOPMENT BY PAO "GAZPROM" (OOO "GAZPROM DOBYCHA YAMBURG")

FIGURE 11. SEFDR «ARKTICHESKAYA»

FIGURE 12. MFDR «POLYARNAYA ZVEZDA»

File name: API-2062