Stages and content of work
1. Analysis of the external environment in the market for exploration and exploration drilling TPI
1.1. General parameters and structure of the Russian market for exploration and exploration drilling TPI
1.1.2001.
1.1.2002.
1.1.2003.
1.1.2004.
1.2. The forecast of the market for geological exploration and exploration drilling TPI in 2020-2025, in monetary terms
1.2.2003.
1.3. Features of exploration and exploration drilling of the main types of other TPI (TOP-20).
2. Identification and analysis of the needs of current and potential consumers in the Russian market of exploration and exploration drilling
Current consumers: Conducting GRP for the already developed TPI deposits (pre -exploration in order to clarify the remaining reserves of fossils)
Potential consumers: Conducting GRP at the TPI not yet developed deposits: at the entrance - forecast indicators (P), at the output a reasonable calculation of reserves by category C1
2.1. Formation of the list of all owners of licenses for other types of TPI (except for common construction construction). A total of 1300 companies.
The name of the Licenser company
Location
The availability of current activities for TPI mining
The scale of the company if the production is already being carried out (2019, in monetary terms)
Type of TPI (iron ore, uranium ores, coal (anthracite), chrome ores, copper ores, copper-nickel ores, polymetallic ores, non-ferrous metals, potassium salts, magmatic rocks (basalt), etc.)
Analysis and study of the needs of 100 companies that already carry out TPI
Whose forces are carried out by the GRP currently (with their, third parties, combination)
The level of interest in working with an external contractor for exploration and exploration drilling at the moment and in the near future
What types of work are most interesting:
Geochemical studies
Geophysical studies
Mining,
Drilling of the wells
Hydrogeological work
Geoecological work
Engineering and geological research
Requirements for the contractor (experience, requirements for the material base, etc.)
Conditions for choosing a contractor (through a public tender, post -payment, deadlines)
2.3. Analysis and study of the needs of 100 companies that have not yet mined TPI
2.3.2001.
2.3.2002.
- Geochemical research
- Geophysical research
- Mining work,
- Drilling of the wells
- hydrogeological work
- Geoecological work
- Engineering and geological research
3. Analysis of competitors
Entering the mining holdings
Volume of services, 2019, in monetary terms
The share in the Russian market of exploration and exploration drilling TPI
Types of work
TPI
Promotion methods
Declared customers
Declated deliveries for the needs of third -party customers
Development plans
4. Development of a promotion strategy
4.1.
4.3.
4.4.
4.5.
4.6.
File name: ТЗ-2020-386