Marketing Study ”as part of the pre -investment study“ Sensation of investments in the construction of a plant for the production of liquefied natural gas with a capacity of 1.5 million tons per year in the area of ​​Vladivostok ”

Print

Дата разработки: 05.10.2018

Информация о проекте представлена для демонстрации наших возможностей. Вы можете заказать аналогичное исследование с учетом Ваших задач.

Заказать аналогичное исследование | Демо-версия

Marketing Study ”as part of the pre -investment study“ Sensation of investments in the construction of a plant for the production of liquefied natural gas with a capacity of 1.5 million tons per year in the area of ​​Vladivostok ”

  1. Analysis of the sales markets of low-tonnage liquefied natural gas (LNG) in the segments of autonomous gasification, LNG bunkers of sea and river transport, the use of LNG as motor fuel in the Russian Federation and in the Asia-Pacific countries;
  2. Promising LNG demand in these segments;
  3. Price forecasts of the cost of LNG in these segments;
  4. The market share of the customer, provided that the gas is delivered to the markets considered in the work, including the Asia -Pacific countries in the above segments of the use of LNG;
  5. Analysis of the competitiveness of LNG in comparison with alternative types of fuel for the period under consideration for each of the analyzed markets in the above segments of LNG use, the quality of the supplied LNG for consumption segments, including LNG bunkering;
  6. Analysis of the possibility of supplying LNG to the Asia -Pacific countries;
  7. The selection and justification of the transportation schemes, the location of the receiving terminals and the ports of the bunkering, the types of vehicles, bunker vessels, as well as cryogenic tank containers and other modes of transport;
  8. Assessment of the distribution of volumes in the analyzed markets and sales prices with the allocation of loading costs, transportation (including freight), receiving terminal services, costs of regaling and other costs for the delivery and implementation of LNG to end consumers depending on the selected market segment and delivery method;
  9. Calculation of forecast "Net Back" of LNG prices by analyzed markets for scenarios for oil prices "Brent" 40, 45, 50, 60, 70 and 75 US dollars/barrel;
  10. Analysis of the reception of infrastructure in the regions of the supply of LNG from the plant expected to build to the construction, taking into account various methods of shipment of products;
  11. Providing a list of existing and planned reception terminals, as well as sites for the possible construction of receiving terminals and other infrastructure facilities necessary for the supply of LNG to end consumers;
  12. Assessment of the number, types and cost of hazard vessels, bunker vessels, cryogenic trucks, railway tanks, as well as cryogenic tank containers and transport for their delivery for selected LNG implementation routes;
  13. Analysis of the prospects for the development of LNG bunkering in the region of the Asia-Pacific region, including the forecast of the dynamics of the transfer of vessels to LNG fuel.